Skip to content

Service 08

Project & Heavy Lift

Route surveys, lift plans, permits, escorts and marine engineering for cargo that will not fit a container and cannot be allowed to fail.

Overview

Project cargo is an engineering exercise with a shipping invoice attached. The planning happens on paper long before anything moves.

  • 01

    Survey first

    Physical route surveys covering bridge loadings, swept paths, overhead clearances and ground bearing capacity.

  • 02

    Engineered lifts

    Method statements, rigging drawings and lift plans prepared and reviewed before mobilisation.

  • 03

    Sector experience

    Oil and gas, power generation, water infrastructure and large-scale construction across the Gulf.